Standard renovation project phases
Most renovations move through the same phases in the same order. This is a timeless checklist to sequence a project and see where the money and the permit-gated trades fall. It is a planning aid, not a code reference — confirm requirements with your local building department.
| Phase | Typical work |
|---|---|
| 1. Planning & design | scope, measurements, budget, contingency |
| 2. Permits | building department approval for structural/electrical/plumbing/gas |
| 3. Demolition | remove existing finishes and fixtures |
| 4. Rough-in | framing, electrical, plumbing, HVAC (licensed pros) |
| 5. Inspections | rough-in inspections before closing walls |
| 6. Insulation & drywall | insulate, hang and finish drywall |
| 7. Finishes | flooring, tile, paint, trim, cabinets, countertops |
| 8. Fixtures & final | plumbing/electrical fixtures, appliances, final inspection |
| 9. Punch list | touch-ups and remaining items before sign-off |
A typical sequence, not a code reference. Permit-gated trades (structural, electrical, plumbing, gas) require licensed pros and inspections — confirm with your local building department.